A dramatic upgrade to a plant down in Matamoras, Mexico, designed and installed by DRM.
DRM's crew worked on site for several months to insure quality control over every aspect of the project..
A demonstration in DRM's expertise in robotic engineering.
Paint and Dispensing systems require a complex combination of systems for A.O. Smith
A DRM onsite technician guides the saetting of a tank outside trhe plant. First designed on 3D CAD, botrh heating and cooling processes are contained in a complex piping system.